S.J.Prouse Design are accredited
SAP Surveyors and BINDT Registered Pressure Testers
and offer a complete package for SAP Surveys and
Air Tightness Testing.
SAP Calculations - New
Build and Conversions
SAP
The implementation of the new Part L1 Building
Regulations states that SAP 2005 is the only
assessment available for new dwellings. We utilise
the services and software of Elmhurst Energy
Services Ltd and are accredited and licensed SAP
assessors with over seven years experience.
The
SAP rating is based on the energy costs associated
with space heating, ventilation and lighting, less
cost saving from energy generating technologies. It
is adjusted for floor area so that it is
essentially dependent on dwelling size for a given
built form. We are able to prepare
SAP reports off site, at the design stage, based on
the drawings and construction materials of the
dwelling, although site visits can be arranged if
necessary. Tailored to individual build techniques
and specifications our aim is to produce cost
effective solutions to comply with Building
Regulation requirements.
'U'
VALUE CALCULATIONS
Extensions and conservatories
require 'U' Value calculations for walls, roofs and
floor that satisfy the requirements of Building
Regulations. We are able to provide the
calculations necessary for solutions to both new
build and upgraded existing constructions.
PREDICTED ENERGY ASSESSMENTS
(PEAs)
On
production of the SAP calculations at the design
stage we can produce the Predicted Energy
Assessment for a proposed dwelling. This
certificate is required for inclusion in the Home
Information Pack (HIPs) for properties that are
marketed before completion.
ENERGY PERFORMANCE CERTIFICATES
(EPCs)
We
are also accredited to issue Energy Performance
Certificates for 'As Built' New Dwellings and
Conversions, that fulfil the completion
requirements of building control bodies and that
are necessary for inclusion in the Home Information
Packs (HIPs) for marketing purposes. Reports are
prepared off site based on the drawings and
materials of construction of the dwelling.
Air Pressure
Tests
The
Benefits of using S.J.Prouse Design include
- Quick service, only 7 days
notice required.
- Typical test only takes 2
hours.
- Full test report on same day as
test.
- Full BINDT certification
delivered within 7 days of test.
- Local, highly skilled and
motivated staff.
- Cost effective.
- Avoid costs associated with site
delays.
- Technicians are BINDT registered
(BINDT Registration No, 0093)
- Test is compliant with Part L1A
of Building Regulations.
- All testing is carried out by
staff trained and assessed to the standards and
requirements set out by BINDT (British Institute
of Non-Destructive Testing), and ATTMA (Air
Tightness Test and Measurement
Association)
A brief guide to the preparation of
new domestic buildings prior to air pressure
testing.
- Building Regulations require
that new domestic dwellings must demonstrate
that they are airtight.
- An Air Tightness Test is
required to demonstrate compliance with the
Building Regulations.
- The test can only be done when
the critical criteria have been satisfied.
- The test must be carried out by
trained and competent staff.
- Prior to the test date, the
buildings detailed dimensions will be required
as will the original SAP report.
Pre-Test Inspection
- All external doors to be
closed.
- All internal doors to be wedged
open.
- Extracts to be sealed,
mechanical systems to be switched off and sealed
ie kitchen/bathroom extractions fans, cooker
hoods etc
- Drainage traps to be filled with
water.
- All boilers and combustion
appliances, if inside the building envelope, to
be shut down.
- Trickle vents to be
closed.
- Any fireplaces to be temporarily
sealed.
- There must be NO temporary seals
to doors, letter boxes, manual trickle vents,
cat flaps, keyholes, penetrations through walls,
tumble drier vents, windows and sills.
- There must be NO temporary seals
to drains, plugs or overflows
- ALL building works must be
completed to air seal the building envelope
including doors, windows, hatches, sills and
services.
Note
It
is advisable to complete a checklist of all
temporary seals that are applied to ensure that
they are removed after the internal Air Pressure
Test has been carried out.
After the test
All
of the collected data will be analysed on site and
the air tightness factor will be disclosed. There
can be two possible outcomes:
PASS. When a building
passes the test the data is used offsite to produce
a controlled and traceable Test Certificate issued
by BINDT. This is normally done immediately and
will be sent to the client on receipt of the
outstanding fee. The original SAP will need to be
amended to show the measured Air Pressure Test
reading and a laminated display notice
issued.
FAIL. If a building fails
to meet the required outcome a draft copy of the
results may be supplied. If any issues have been
located that can be rectified promptly a retest may
be carried out. Otherwise the source of the leakage
will have to be identified and another Air Pressure
Test carried out at a later date to prove
compliance. Additional fees will be required if
another Test is carried out at a later date.
Commercial
EPC's
We
are pleased to be associated with 'Footprint
Energy Assessments Ltd' who undertake Part
L2a & Part L2b Compliance and
Commercial EPC;s on our behalf. Click here for further
information.
To
make an enquiry to S.J. Prouse Design please click
here.
|